Rumoi Main Line
The Rumoi Main Line (留萌本線, Rumoi-honsen) was a Japanese railway line in Hokkaido formerly operated by Hokkaido Railway Company (JR Hokkaido) which connected Fukagawa Station in Fukagawa and Mashike Station in Mashike. Following the discontinuation of service between Rumoi and Ishikari-Numata on 1 April 2023, the Rumoi Main Line was the shortest railway line in Japan to be classified as a "main line", at just 14.4 kilometers (8.9 mi). On 19 November 2016, JR Hokkaido's president announced plans to further rationalize the network by up to 1,237 km (769 mi), or approximately 50% of the network, including closure of the remaining section of the Rumoi Main Line (the Rumoi to Mashike section closed on 5 December 2016). This section of track from Ishikari-Numata to Rumoi was closed on 1 April 2023, with the final train running on 31 March 2023. The remaining track, between Fukagawa to Ishikari-Numata, closed on 1 April 2026, with the final train running on 31 March 2026.
| Rumoi Main Line | |||
|---|---|---|---|
A single KiHa 54 series DMU at Ishikari-Numata Station in October 2025 | |||
| Overview | |||
| Status | Closed | ||
| Owner | JR Hokkaido | ||
| Locale | |||
| Termini | |||
| Stations | 20 | ||
| Service | |||
| Type | Regional rail | ||
| Operator(s) | JR Hokkaido | ||
| Rolling stock | KiHa 54 series DMU, KiHa 150 series DMU[1] | ||
| History | |||
| Opened | 23 October 1910 | ||
| Closed | 5 December 2016 (Rumoi–Mashike) 1 April 2023 (Ishikari-Numata–Rumoi) 1 April 2026 (entire line) | ||
| Technical | |||
| Line length | 66.8 km (41.5 mi) | ||
| Number of tracks | Entire line single tracked[1] | ||
| Character | Rural | ||
| Track gauge | 1,067 mm (3 ft 6 in)[1] | ||
| Electrification | None[1] | ||
| Operating speed | 95 km/h (59 mph) | ||
| |||
The Rumoi Main Line (留萌本線, Rumoi-honsen) was a Japanese railway line in Hokkaido formerly operated by Hokkaido Railway Company (JR Hokkaido) which connected Fukagawa Station in Fukagawa and Mashike Station in Mashike. Following the discontinuation of service between Rumoi and Ishikari-Numata on 1 April 2023, the Rumoi Main Line was the shortest railway line in Japan to be classified as a "main line", at just 14.4 kilometers (8.9 mi).[2][3]
On 19 November 2016, JR Hokkaido's president announced plans to further rationalize the network by up to 1,237 km (769 mi), or approximately 50% of the network,[4] including closure of the remaining section of the Rumoi Main Line (the Rumoi to Mashike section closed on 5 December 2016). This section of track from Ishikari-Numata to Rumoi was closed on 1 April 2023, with the final train running on 31 March 2023. The remaining track, between Fukagawa to Ishikari-Numata, closed on 1 April 2026, with the final train running on 31 March 2026.[5][needs update]
History
[edit]The initial section of the line, between Fukagawa and Rumoi opened on 23 October 1910, and was extended to Mashike on 5 November 1921.[6][7] At its peak, the line had a length of 66.8 km (41.5 mi).[7] The line was reclassified as a "main line" from 10 October 1931.[6] With the privatization of Japanese National Railways (JNR) on 1 April 1987, the line came under the control of JR Hokkaido.[6]
Closure plans
[edit]On 10 August 2015, JR Hokkaido informed the mayors of Rumoi and Mashike of its plans to close the 16.7 km (10.4 mi) section of the line from Rumoi to Mashike in 2016.[8] In April 2016, it was officially announced that the section from Rumoi to Mashike would close, and the last service operated on 4 December of that year.[9] The four towns and cities along the remaining line – Rumoi, Numata, Chippubetsu, and Fukagawa – began discussions with JR Hokkaido regarding the line's future, but Rumoi withdrew from the council due to having automobile infrastructure in place (due to the opening of the Rumoi Interchange on the Fukagawa-Rumoi Expressway in 2020, after which only 60 city residents used the train).[10]
In September 2022, JR Hokkaido submitted a proposal to the Ministry of Land, Infrastructure, Transport and Tourism to close an additional 35.7 km (22.2 mi) between Ishikari-Numata and Rumoi.[11][12] The closure was approved on 9 December 2022,[13] end-of-service was announced for 31 March 2023, and the closure occurred on 1 April 2023.[14][15]
Although the rest of the municipalities proposed that the rest of the line remains open, the proposal failed when JR Hokkaido demanded 300,000,000 yen yearly to keep the line open.[10] As a result, the remaining 14.4 km (8.9 mi) section to Fukagawa closed on 1 April 2026.[5][16][12] On the final timetable revision on 14 March 2026, through service via the Hakodate Main Line was abolished.[17]
After closure, the Hidaka Main Line became the shortest "main line" in Japan, at 30.5 km.[18]
Stations
[edit]| No. | Picture | Station name | Japanese | Between (km) |
Distance (km) |
Transfers | Location |
|---|---|---|---|---|---|---|---|
| ↓ Closed on 1 April 2026 ↓ | |||||||
| A24 | Fukagawa | 深川 | -- | 0.0 | ■ Hakodate Main Line ■ Shinmei Line (Closed 1995) |
Fukagawa | |
| Kita-Ichiyan | 北一已 | 3.8 | 3.8 | ||||
| Chippubetsu | 秩父別 | 5.0 | 8.8 | Chippubetsu, Uryū District | |||
| Kita-Chippubetsu | 北秩父別 | 2.4 | 11.2 | ||||
| Ishikari-Numata | 石狩沼田 | 3.2 | 14.4 | ■ Sasshō Line (Partially closed 1972) | Numata, Uryū District | ||
| ↓Closed on 1 April 2023 ↓ | |||||||
| Mappu | 真布 | 3.4 | 17.8 | Numata, Uryū District | |||
| Ebishima | 恵比島 | 2.9 | 20.7 | ||||
| Tōgeshita | 峠下 | 7.6 | 28.3 | Rumoi | |||
| Horonuka | 幌糠 | 6.2 | 34.5 | ||||
| Fujiyama | 藤山 | 5.5 | 40.0 | ||||
| Ōwada | 大和田 | 4.2 | 44.2 | ||||
| Rumoi | 留萌 | 5.9 | 50.1 | ■ Haboro Line (Closed 1987) | |||
| ↓ Closed on 5 December 2016 ↓ | |||||||
| Segoshi | 瀬越 | 2.1 | 52.2 | Rumoi | |||
| Reuke | 礼受 | 4.0 | 56.2 | ||||
| Afun | 阿分 | 1.3 | 57.5 | Mashike, Mashike District | |||
| Nobusha | 信砂 | 2.7 | 60.2 | ||||
| Shaguma | 舎熊 | 0.8 | 61.0 | ||||
| Shumombetsu | 朱文別 | 1.7 | 62.7 | ||||
| Hashibetsu | 箸別 | 1.3 | 64.0 | ||||
| Mashike | 増毛 | 2.8 | 66.8 | ||||
References
[edit]- ^ a b c d Soiri 2025, pp. 17.
- ^ "「日本一短い本線」ついに全線廃止へ 代替となる"新しい交通体系"が明らかに". 乗りものニュース (in Japanese). 11 March 2025. Retrieved 21 September 2025.
- ^ "<東京新聞 鉄道クラブ>なんちゃって本線:東京新聞デジタル". 東京新聞デジタル (in Japanese). Retrieved 21 September 2025.
- ^ "JR Hokkaido says it can't maintain half of its railways". 10 May 2013. Archived from the original on 20 November 2016. Retrieved 26 November 2016.
- ^ a b "JR北海道 留萌本線 深川—石狩沼田間ラストラン" [JR Hokkaido Rumoi Main Line: Last run between Fukagawa and Ishikari-Numata.]. Japan Railfan Magazine (in Japanese). Retrieved 1 April 2026.
- ^ a b c Ishino, Tetsu, ed. (1998). 停車場変遷大辞典 国鉄・JR編 [Station Transition Directory - JNR/JR] (in Japanese). Vol. I. Japan: JTB. pp. 83, 129. ISBN 4-533-02980-9.
- ^ a b "北の鉄路がまた一つ消える……JR留萌本線が3月31日に廃線。その歴史と功績に、ありがとう(旅行読売)". Yahoo!ニュース (in Japanese). Retrieved 24 March 2026.
- ^ 留萌線(留萌~増毛間)の鉄道事業廃止について [Closure of Rumoi Line between Rumoi and Mashike]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing Co., Ltd. 10 August 2015. Archived from the original on 8 December 2015. Retrieved 11 August 2015.
- ^ JR留萌線留萌―増毛間12月4日に廃止 増毛町が同意 [Mashike agrees to closure of JR Rumoi Line between Rumoi and Mashike on 4 December]. Doshin Web (in Japanese). Japan: The Hokkaido Shimbun Press. 8 April 2016. Archived from the original on 8 April 2016. Retrieved 14 April 2016.
- ^ a b big5 (2 November 2022). "【JR北海道】二段階で廃止へ-留萌本線を残せなかった理由とは". 鉄道協議会日誌 (in Japanese). Retrieved 30 April 2024.
{{cite web}}: CS1 maint: numeric names: authors list (link) - ^ "JR北海道,留萌本線 石狩沼田—留萌間の鉄道事業廃止届を提出" [JR Hokkaido Rumoi Main Line Ishikari-Numata - Rumoi service discontinuation proposal submitted]. Japan Railfan Magazine Online (in Japanese). 10 September 2022. Archived from the original on 11 September 2022. Retrieved 14 September 2022.
- ^ a b "留萌本線「一部廃止」来春にも JR北海道が国交相に届出、残る区間も3年半後まで" [Rumoi Main Line "Partially abolished": JR Hokkaido will notify the Minister of Land, Infrastructure, Transport and Tourism next spring, and the remaining section will be closed 3 and a half years later]. news.railway-pressnet.com (in Japanese). 9 September 2022. Archived from the original on 9 September 2022. Retrieved 14 September 2022.
- ^ "留萌本線の一部廃止「来年4月1日」確定 朝ドラ『すずらん』明日萌駅も消滅 | 鉄道ニュース【鉄道プレスネット】" (in Japanese). 9 December 2022. Retrieved 13 December 2022.
- ^ "鉄道事業の一部廃止の日を繰り上げる届出について" (PDF). 国土交通省北海道運輸局鉄道部. Archived from the original (PDF) on 9 December 2022. Retrieved 17 February 2023.
- ^ "留萌線(石狩沼田・留萌間)の廃止日繰上げの届出について" (PDF). 北海道旅客鉄道. Archived from the original (PDF) on 9 December 2022. Retrieved 17 February 2023.
- ^ "留萌線の鉄道事業廃止届の提出について" (PDF). JR Hokkaido (in Japanese). 28 March 2025. Archived (PDF) from the original on 28 March 2025. Retrieved 21 September 2025.
- ^ "3月14日ダイヤ改正以降の留萌線運転時刻について" [Regarding the operating times of the Rumoi Line after the timetable revision on March 14] (PDF) (Press release) (in Japanese). JR Hokkaido. Archived from the original (PDF) on 9 February 2026. Retrieved 24 March 2026.
- ^ "JRで最も短い「本線」ついに全線廃止に 次の最も短い「本線」はどの路線?". 鉄道コム (in Japanese). 31 March 2026. Retrieved 1 April 2026.
Bibliography
[edit]- Soiri, Masashi (25 September 2025). 全国鉄道路線大全 2025-2026 (in Japanese). Ikaros Publications. ISBN 978-4-8022-1637-1.